Plants, Equipment & Resources
Documented construction plant, machinery, formwork systems, precision survey instruments, site logistics fleet, and technical engineering personnel supporting projects across Pakistan.
Details of Plants & Equipment
The following inventory documents the plant, machinery, formwork, survey equipment, and site logistics fleet listed in the official Aura Engineers Corporate Capability Profile 2026.
| S.No | Equipment Description | Quantity / Status | Operational Application |
|---|---|---|---|
| Formwork & Staging Assets | |||
| 01 | Scaffolding Pipe | 25,000 Rft | Multi-story structural staging & exterior access |
| 02 | Joints | 7,500 nos | Heavy scaffolding pipe connection couplers |
| 03 | MS Steel / Ply Formwork | 6,000 Sft | Fair-face concrete columns, slabs, and shear walls |
| 04 | Wooden Runners | 4,500 Rft | Slab and deck horizontal support framework |
| 05 | Wooden Planks | 100 Nos | Working platform decking and walkway staging |
| Survey & Alignment Equipment | |||
| 01 | Total Station | 1 no | High-precision electronic coordinate setting & boundary control |
| 02 | Digital Theodolite | 1 no | Angular measurement and vertical structural alignment |
| 03 | Level Instrument | 2 nos | Benchmarking, slab leveling, and foundation elevations |
| Concrete & Compaction Equipment | |||
| 01 | Concrete Vibrators (Petrol & Electric Driven) | 3 nos | Deep compaction and air removal in mass concrete |
| 02 | Plate Compactors | 1 no | Sub-base soil & aggregate compaction |
| 03 | Baby Roller | 1 no | Trench compaction, roadworks, and paving bases |
| 04 | Full Load Mixer Machine | 1 no | High-capacity on-site concrete batch mixing |
| 05 | Half Load Mixer Machine | 1 no | Medium batch concrete and mortar preparation |
| 06 | Concrete Conveying & Pumping Equipment | On Rental Basis | High-volume mass pours and high-rise concrete pumping |
| Steel Cutting & Bending Machinery | |||
| 01 | Steel Cutting Machine (Jute) | 1 no | High-speed rebar cut-to-length site fabrication |
| 02 | Steel Bending Machine (Jute) | 1 no | Precision rebar hook and crank bend fabrication |
| 03 | Heavy Duty Drilling Machine | 1 no | Anchor bolt and structural steel hole boring |
| 04 | Electric Grinding Machine | 1 no | Structural steel preparation and weld finishing |
| 05 | Pneumatic Hammer / Chiseller | 2 nos | Concrete demolition, chipping, and trench chiseling |
| Power, Lifting & Dewatering Assets | |||
| 01 | Lift Hoist Machine with 100'-0" Tower | 1 no | Multi-story vertical haulage for materials and mortar |
| 02 | 10KV Generators | 1 no | Standby uninterrupted site power supply |
| 03 | Welding Plants | 2 nos | Structural steel erection, rebar welding, and piping |
| 04 | Electric & Petrol Driven Dewatering Pump | 2 nos | Basement and trench water table evacuation |
| 05 | Loaders & Graders | On Rental Basis | Mass earthmoving, site clearance, and grading |
| 06 | Tractors | On Rental Basis | Site material transport and trolley haulage |
| Transport & Logistics Fleet | |||
| 01 | Toyota Hilux Pickup | 1 no | Rapid field team deployment and emergency logistics |
| 02 | Belta Toyota 2007 | 2 nos | Project management executive site mobility |
| 03 | 70cc Bike | 4 nos | Site supervisor and inspection coordination fleet |
Preventive Maintenance Protocol
As documented in our corporate management manual: "A comprehensive program of equipment maintenance is practiced to avoid any surprise failure and to use equipment up to its optimum level."
Equipment maintenance includes scheduled inspection, servicing, and preventive checks. Mixers, vibrators, generators, and lifting machinery receive routine mechanical checks prior to concrete pours and continuous operation on site.
Maintenance Highlights:
- Pre-pour mechanical inspections of concrete mixers and vibrators
- Routine calibration and alignment verification for Total Station and optical levels
- Standby vibrator needles and backup dewatering pumps on critical pours
- Inspection and quality checks of scaffolding pipes, clamps, and couplers
- Regular servicing of site generator sets and welding plants
Key Personnel & Technical Resources
Experienced technical and site personnel support project planning, execution, supervision, and site operations across Pakistan.
| S.No | Name | Designation / Role | Qualification | Experience |
|---|---|---|---|---|
| Executive Leadership | ||||
| 01 | Engr. Fahim Shafi | Director | B-Tech (Civil) | 20 Years |
| 02 | Ar. Muhammad Salman | Director | Architect | 18 Years |
| Project Management & Quality Assurance | ||||
| 03 | Engr. Tariq Aziz | Project Manager | B.E. (Civil) | 16 Years |
| 04 | Engr. Kashif Mehmood | Senior Construction Manager | B.E. (Civil) | 14 Years |
| 05 | Engr. Zeeshan Ali | QA / QC Manager | B.E. (Civil) | 12 Years |
| 06 | Engr. Bilal Ahmed | Structural Design Engineer | M.S. (Structural Engineering) | 11 Years |
| 07 | Engr. Owais Khan | MEP Coordinator | B.E. (Electrical) | 10 Years |
| 08 | Engr. Farhan Siddiqui | Planning & Scheduling Engineer | B.E. (Civil) / Primavera P6 | 8 Years |
| Site Engineering & Supervision | ||||
| 09 | Engr. Rizwan Sheikh | Lead Site Engineer (Civil) | B.E. (Civil) | 9 Years |
| 10 | Engr. Hamza Javed | Site Engineer (Structures) | B.E. (Civil) | 7 Years |
| 11 | Engr. Asadullah | Site Engineer (MEP / HVAC) | B.E. (Mechanical) | 6 Years |
| Quantity Surveying & Commercial Control | ||||
| 12 | Mr. Imran Qureshi | Senior Quantity Surveyor | D.A.E. (Civil) / Quantity Surveying | 15 Years |
| 13 | Mr. Nasir Abbas | Assistant Quantity Surveyor | D.A.E. (Civil) | 8 Years |
| Health, Safety & Environment (HSE) | ||||
| 14 | Mr. Sajid Hussain | HSE Lead Specialist | NEBOSH / OSHA Certified | 11 Years |
| 15 | Mr. Kamran Malik | Site Safety Officer | IOSH / Field Safety Certified | 6 Years |
| Specialized Field Technical Specialists | ||||
| 16 | Mr. Ghulam Mustafa | General Site Foreman | D.A.E. (Civil) | 18 Years |
| 17 | Mr. Muhammad Rashid | Steel Structure Supervisor | Certified Welding & Erection Inspector | 14 Years |
| 18 | Mr. Abdul Waheed | Chief Land Surveyor | Advanced Geodetics & Total Station | 16 Years |
| 19 | Mr. Tanveer Ahmed | Materials & Soil Lab Technician | Material Testing & Concrete QA | 10 Years |